ConeTec CPT rigs are capable of accessing urban centers, remote sites, mine tailings, and active construction areas. Built between 18-35 tons / 180-350kN, on tracks and on trucks, these are the hardest pushing rigs in the industry. Advanced hydraulic systems ensure penetration rates and CPT quality are maintained, while safety and efficiency are maximized.
3D Animation
FEATURES
18-35 ton / 180-350kN thrust capacity
4 point leveling jacks
On board decon facilities
Stainless steel laboratory interiors
Onboard air and 110 V electricity
Rear view cameras
CPT monitoring cameras
Integrated seismic beams
Positive air shut offs
Integrated auger and grouting capabilities (some models)
Tracked rigs 3-6 psi ground pressure depending on the rig
advantages
Unprecedented penetration capabilities - max to date: 175 m or qc = 120 MPa
QUICK LINKS